Project description
- Project Type : Transformation
- Client : EPIC
- Works management : Bosredon SA
- Typology : Administrative building with 7 levels and two levels of parking.
Project Characteristics
- Label : MINERGIE
- Project duration : 18 months
- Delivery : 2023 (1st stage)
Transformation of the thermal envelope
Located at the entrance to Lausanne, this administrative building from the 90s has been completely transformed in terms of its façade. After the removal of the existing double skin, an insulated stainless steel façade with an avant-garde design made the project MINERGIE.